DESIGNATIONS |
CLIENTS |
TRAVAUX DE VOIRIE SOUS TRAITANCE |
C.N.E.P. ORAN |
OUVERTURE DE PISTES ET DIVERS TRAVAUX DE GENIE CIVIL |
E.T.T.R HASSI MESSAOUD |
PISTES ET TERRASSEMENT PIPES R.T.O |
SOUS TRAITANCE AVEC SARPI |
REALISATION DE VOIRIES |
APC D’ES- SENIA (ORAN) |
REALISATION DE VOIRIES |
APC DE SIDI CHAMI (ORAN) |
REALISATION D’UN TRONCON DE ROUTE (Type Autoroutier) |
D.T.P. ORAN. |
REMISE EN ETAT DE L’ACCOTEMENT |
SUBDIVISION D.T.P D’AIN-EL-TURCK |
REALISATION D’UNE BRETELLE ROMPOINT EL-BAHIA |
D.T.P. ORAN. |
EXAUSSEMENT DU CW 20 SUR 7KM entre BOUSFER et AIN TURCK. |
D.T.P ORAN. |
AMENAGEMENT ET MODRNISATION DE LA RN2 AU VOISINAGE DE MERS EL KEBIR (traitement de la zone inondable) |
D.T.P ORAN. |
EHANGEUR GDYEL « EST » RN 11 – CW 32 lot Route. |
D.T.P ORAN. |
DEDOUBLEMENT DE LA RN2 ENTRE MESSERGHINE ET BOULTLELIS (02 lots ) (TYPE AUTOROUTIER) SUR 10 KMS |
D.T.P ORAN. |
TRAVAUX DE REPARATION DU RIVAGE DE LA BAIE DES ANDALOUSE |
D.T.P ORAN. |
REALISATION DE LA NOUVELLE PENETRANTE D’ARZEW Lot N°04 |
D.T.P ORAN. |
REALISATION DE LA NOUVELLE PENETRANTE D’ARZEW
Lot 04 BIS |
D.T.P ORAN. |
MODERNISATION DU C.W. 45 ENTRE LA R.N. 2 ET LE C.W. 44 |
D.T.P ORAN. |
REALISATION ECHANGEUR MISSERGUINE (LOT ROUTE) |
D.T.P ORAN. |
REALISATION DE LA ROUTE RELIANT ARZEW A KRISTEL SUR 25KM (EN COURS DE REALISATION) |
D.T.P ORAN. |
LOT N° 01 : REVETEMENT EN BETON BITUMINEUX DU CW46 SUR 4.5 Km DU PK 18+500 AU PK 23+000 ( HASSI BEN OKBA / RN 11) |
D.T.P ORAN. |
LOT N° 03 : REVETEMENT EN BETON BITUMINEUX DU CW 102 SUR 2.8 Km DU PK 0+000 AU PK 2+800 ( BRAYA / HASSI LABYOD) |
D.T.P ORAN. |
LOT N° 04 : REVETEMENT EN BETON BITUMINEUX DU CW82 SUR 5 Km DU PK 1+700 AU PK 6+700
(RN 11 VERS LIMITE WILAYA MASCARA) |
D.T.P ORAN. |
REALISATION ECHANGEUR MISSERGHINE (LOT ROUTE) |
D.T.P ORAN. |
DEDOUBLEMENT DE LA VOIE DE LA CORNICHE SUPERIEURE CW44
(en cours de réalisation) |
D.T.P ORAN. |